Sample Rough Estimate free essay sample
Area of the Building=44. 51 Sq m As per Specification of APWD SOR 2004-2005 (Building) ââ¬ËAââ¬â¢ 1. Plinth Protection: 75 mm thick prop 1:3:6 2. Plinth Beam: As per design (RCC) 3. Plinth Wall a) Outer Wall: 225mm thick 1st class brick works in cement mortar in prop1:5 and 15mm thick cement plaster in prop 1:6 on exposed faces with neat cement slurry finish. b) Inner Wall: 112mm thick 1st class brick work in cement mortar in prop1:5. 4. DPC: providing and laying 25mm thick damp proof course with cement concrete in prop 1:1. :3 with graded stone aggregate of 10mm down nominal size including providing approved damp proof admixture in proportion as recommended by the manufacture including curing etc. complete as directed. 5. Post: 130mm x130mm RCC as per design 6. Foundation: With RCC foundation as per design depth of foundation 1. 0 m from original ground level 7. Floor: 65mm thick cement concrete flooring with 50mm under layer of cement concrete in prop 1:3:6 and 15mm thick cement concrete topping in prop 1:1:2 over one flat brick soling/150mm thick stone soling. We will write a custom essay sample on Sample Rough Estimate or any similar topic specifically for you Do Not WasteYour Time HIRE WRITER Only 13.90 / page 8. Wall: 112mm thick brick nogged wall in prop 1:5, from plinth upto post plate with cement plaster 15mm thick on outside face, 10mm thick on inside face in prop 1:5 including distempering over plaster of peris or wall putty. Outer wall will be finished with cement wash/ weather coat with cement primer. 9. Window / Clerestory window : As per Architectural Design 10. Door: As per Architectural Design 11. Roofing: 0. 63 I. S. thickness (in mm) C. I. roofings over undressed wodden/ Timber truss. 12. Ceiling : A. C. board / Gypsum Board with painting. 3. Miscellaneous: C. C. apron with drain, cup board, socket, door and window leaf to be painted with one coat of primer and two coats of enamel paint of approved shade. 14. Height of plith: 600 750mm for all buildings 15. Height of building: 3050 3600mm. Rate of Plinth Area=Rs. 5,990. 00 / Sq m =Rs. 5,990. 00 x 44. 51 Civil Cost=Rs. 2,66,614. 90 Services: Electrification 12. 5% of the Civil Cost=Rs. 33,326. 86 Grand Total=Rs. 2,99,941. 76 Say=Rs. 2,99,941. 00 (Rupees Two Lakh Ninety Nine Thousand Nine Hundred Forty One Only) Prepared by -Checked By ââ¬â
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.